This was a job in which four columns were trimmed out. First a 3/4" top cap is cut to size. It's then sawn in half and glued back together with floating tenons for a flush seam.
This was a job in which four columns were trimmed out. First a 3/4" top cap is cut to size. It's then sawn in half and glued back together with floating tenons for a flush seam.
Next the cap is installed level in both directions. Blocking is cut from 2X4 stock. It provides material to fasten the column to and locates the column in the correct position.
Next the cap is installed level in both directions. Blocking is cut from 2X4 stock. It provides material to fasten the column to and locates the column in the correct position.
Flutes were set out and cut in the shop.
Flutes were set out and cut in the shop.
Joints are aligned with biscuits.
Joints are aligned with biscuits.
Crown and a band molding are added.
Crown and a band molding are added.
IMG_2062.jpg
IMG_2063.jpg
Base added to columns and room. Multiple double doors were installed and trimmed out as well.
Base added to columns and room. Multiple double doors were installed and trimmed out as well.
This was a job in which four columns were trimmed out. First a 3/4" top cap is cut to size. It's then sawn in half and glued back together with floating tenons for a flush seam.
Next the cap is installed level in both directions. Blocking is cut from 2X4 stock. It provides material to fasten the column to and locates the column in the correct position.
Flutes were set out and cut in the shop.
Joints are aligned with biscuits.
Crown and a band molding are added.
IMG_2062.jpg
IMG_2063.jpg
Base added to columns and room. Multiple double doors were installed and trimmed out as well.
This was a job in which four columns were trimmed out. First a 3/4" top cap is cut to size. It's then sawn in half and glued back together with floating tenons for a flush seam.
Next the cap is installed level in both directions. Blocking is cut from 2X4 stock. It provides material to fasten the column to and locates the column in the correct position.
Flutes were set out and cut in the shop.
Joints are aligned with biscuits.
Crown and a band molding are added.
Base added to columns and room. Multiple double doors were installed and trimmed out as well.